Leasehold, a 213m² plot with 33% already built on.
These are the things about your house that decide what you are allowed to build and what it would be worth doing. We looked them up so you do not have to, and each one says what it means for you.
How you own it
Leasehold, over 300 years leftLand Registry title LA181059You own the property but not the ground under it. The lease runs so far beyond a normal lifetime that it behaves much like freehold, though the freeholder is still worth asking before structural work.
Your plot
213m²33% already built onThe land your house stands on. About 143m² of it is still open ground, and anything you build has to fit in that.
Garden depth
About 16.3mEstimated from the title planThe distance from your back wall to the end of the garden. It is what decides how far a rear extension could reach before it runs out of room.
Roof height
8.7mTo the highest point of the roofHow tall the house already is. An extension is usually judged on staying below this line, so it sets the ceiling for anything you add.
Space inside
93m²From the energy certificateThe heated floor space you have today, to measure any addition against.
Energy rating
FScored 23, checked February 2026Where the house sits on the A to G scale for running costs, A being cheapest. Certificates last ten years, so an old one is worth redoing before you sell.
Last sold for
£220,000January 2026What it changed hands for last time, from the Land Registry. A starting point when you weigh up what work would be worth doing.
Worth knowing before you plan work
Very low from rivers, medium from surface water. That does not stop you building, but the council will want to see how floor levels and drainage handle water before they sign it off.
The title carries a flood constraint, so the council will want to see how a new floor level and drainage deal with water.
The plot falls in an SSSI impact zone. SSSI stands for Site of Special Scientific Interest, a protected piece of nature nearby. The zone means the council consults Natural England about large schemes; a house extension is not usually one of them.
This is a radon area. Radon is a natural gas that rises out of the ground across much of the country. If you build a new ground floor, the builder lays a sheet barrier under it, which is a standard part of the job rather than a complication.
The checks on this address6 answered
Solar and roofNot in this reportWhether this roof suits solar panels.
Now show us inside
Pick a room below and add a photo. We paint it up in a few looks, price the work, and put you in front of a firm on your patch. Two views of the same room work best.