Floor plan
How the rooms fit together
The agent's floor plan, as drawn for the listing. Tap one to see it full size, or .
A end-of-terrace house on Brymers Avenue, Portland. Nothing about it is protected, the council puts no extra rules on this street. That is about as free a hand as a house gets.
Floor plan
The agent's floor plan, as drawn for the listing. Tap one to see it full size, or .
The house
What it means One open side at least means a side extension and a wrap-around are on the table as well as the back, and builders can get round to the garden without going through the house.
Why it matters How the house is built decides how it is extended: cavity walls take a steel beam without fuss, and a roof with a gable has a full-height loft under it.
The land
The open side means a side extension and a wrap-around are on the table as well as the back, and a builder can reach the garden without coming through the house.
Why it matters The plot decides how far out and how far down the side the house can grow.
Plot size, tenure and the registered boundary are read from the title with the full extension report.
Without asking anyone
Permitted development applies here. No Article 4 direction on this street.
What it means Permitted development means no planning application, no neighbours consulted and no planning fee. Building control still checks the work.
Why it matters Most of what this house could become is on this list. The schemes that go past it say so up front, with what the application involves.
What protects it
What it means The normal rules apply to the front, the roof and the windows. No extra consent on top of planning.
Why it matters On a listed or conservation-area house, a rear dormer or new windows would need an application. Here they do not.